Everything you need to know about the new Plattekill library building.
The library was established as a reading center in 1972 and opened in 1973. The current building was built in 1927 as a primary school and closed in June 1973. It became an association library in 1984 and transitioned to a public library in 2003.
The library served 3,380 card holders in 2025.
The current facility is not ADA compliant and is difficult for those with mobility challenges. It is too small for books, staff, programs, meetings, and study areas. The new building will feature green energy technology, lower operating costs, a modern inviting design, and a more cohesive workspace for staff.
The final cost is still being calculated and will be shared publicly as soon as it's finalized — see The Bond page for the latest. The library is a Special District Public Library, owned by the public and operated by its Board of Trustees.
Allen Ross Architecture, LLC of New Paltz, NY — experienced in institutional, residential, and commercial projects.
The library is actively pursuing grants. Past grants supported the purchase of the current building, the electronic sign, and the heating/cooling system. New grants are in process for septic and building upgrades to the existing building.
The new building will add a larger children's room, more computers, additional study areas, flexible meeting spaces, and expanded programming capacity — while continuing current services like books, digital resources, and employment help.
Plans are posted on this website and at the library. Public forums have been held (October 14 and November 3), with more community engagement planned ahead of the bond vote in fall 2026 or spring 2027.
Email voteplattekilllibrary@gmail.com, or speak with the Director, Board President, or Committee Chair at the library.